Non-Compliance detail


  
Summary
 
Licence number: 733
Annual Return Start: 01 Oct 2012
Annual Return End: 30 Sep 2013
Date Received: 27 Nov 2013
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.2 BOD & TSS load limits exceeded due to algal blooms in final maturation pond. Plant upgrade start 2012. UV treatment process commissioned May 2013, treated effluent bypassing maturation ponds since 21/6/2013 resulting in significant decrease in loads. Appropriate Action taken by licensee 1
M2.2 Monitoring samples missed due to heavy wet weather & flooding preventing access to Monitoring Point 1. Primary sampling point has been relocated as part of recent upgrade. Point 3 located above flood levels. Maturation Pond 2 storage level reduced. Appropriate Action taken by licensee 2